SEYMEN BOOSTER UNIT

CAPACITY:

6.000 m3/h

WORKS PERFORMED:

Booster station project design, mechanical, electrical and automation systems, commissioning.

SYSTEM SCOPE:

Blower, dehumidification system, replacement of existing automation system, remote monitoring system.

SEYMEN BOOSTER UNIT

The booster system with a capacity of 6,000 m³/h for the Seymen Landfill and Energy Generation Facility, the construction of which started in 2018, was commissioned in 2022.

The automation system, which provides the transfer of methane gas generated in the landfill to the gas balloon or engines with the help of a booster, was revised and increased to 24.000 m³/h capacity. Seymen Booster Unit, which pioneers innovative technologies in its field, continues its work with a design that supports minimum operator control.