DÜZCE BOOSTER UNIT

CAPACITY:

2.700 m3/h

WORKS PERFORMED:

Booster station project design, mechanical, electrical and automation systems, commissioning.

SYSTEM SCOPE:

Container, blower, gas combustion chimney, gas cooling and dehumidification system, remote monitoring system

DÜZCE BOOSTER UNIT

The works that started in Düzce Indoor Solid Waste Integrated Facility in 2019 were completed in 2020 with the activation of booster systems with a capacity of 2,700 m3/h.

The main functional feature of the facility is that the methane gas formed in the solid waste integrated facility is drawn with the help of a booster and sent to the gas balloon or gas engines. Düzce Booster Unit, built by BMF Enerji, leads the development of Düzce with its fully automatic control and supervision.